top of page
![](https://static.wixstatic.com/media/dd2697_c43132c49a8f49c1be38729c3cbead54~mv2.jpg/v1/fill/w_980,h_551,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/dd2697_c43132c49a8f49c1be38729c3cbead54~mv2.jpg)
White River Hydroelectric Dam Site Work
Location: Brothers Township, Ontario
Description:
Rock drilling, blasting, and excavation for dam powerhouse, spillway, and diversion channel.
Aggregate production
Road construction, site work, dewatering dam site
Value: $13.6 M
Completion Date: 2015
Owner: Pic Mobert Hydro Inc.
bottom of page